The following is for all weather court procedures. Such as Basketball, tennis, volleyball courts. All these have the same procedure of construction. The only difference is in the markings.
A standard tennis court measures, 40x20metres, but however there is room for flexibility to suit the site and also customers preferences.
The first stage when constructing a court is to clear the site, clearing off all rubbles and dirt, then follows the removal of top soil to a depth specified by the engineer depending on the nature of the ground. After the top soil has been excavated and carried away, the excavated area will be filled using gravel which will be compacted in layers to create a firm base or a firm ground that will resist ground failure or ground movements.