The following is for all weather court procedures. Such as Basketball, tennis, volleyball  courts. All these have  the same procedure of construction. The only difference is in the markings. A standard tennis court measures, 40x20metres, but however  there is room for flexibility to suit the site and also customers preferences. The first stage when constructing a court is to clear the site, clearing off all rubbles and dirt, then follows the removal of top soil to a depth specified by the engineer depending on the nature of the ground. After the top soil has been excavated and carried away, the excavated area will be filled using gravel which will be compacted in layers to create a firm base or a firm ground that will resist    ground failure or ground movements.
Powerlane is also involved into the construction of new building, renovations and demolitions. The works under this section are divided into specific work elements such as: